مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

177
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

138
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Seminar Paper

Title

OPTIMIZING THE TIME-CONSTANT OF CAPACITANCE-RESISTANCE SIMULATION TECHNIQUE

Pages

  -

Keywords

CAPACITANCE-RESISTANCE MODEL (CRM) 

Abstract

 DIFFERENT SCIENTISTS HAVE TRIED TO COMBINE PETROPHYSICS, GEOPHYSICS, AND THERMODYNAMICS WITH ECONOMIC FACTORS IN ORDER TO FIND OUT THE BEST RECOVERY SCENARIO. HAVING A GOOD PRODUCTION SCENARIO AND A PROPER FIELD DEVELOPMENT STRATEGY REQUIRE TEDIOUS CALCULATIONS AND SIMULATIONS. PRESENT COMMERCIAL SIMULATORS ARE COMPLEX TO WORK WITH AND TIME-CONSUMING;  THEREFORE, HAVING AN OVERVIEW BY LESS PRIMARY DATA IS NECESSARY TO MANAGE THE FIELD AND TO OPTIMIZE THE RECOVERY. IT WAS A TRIGGER FOR RESERVOIR ENGINEERS TO DEVELOP A FAST AND RELIABLE SIMULATOR. SIMPLE PREDICTIVE MODELS, WHICH USUALLY USE MATERIAL OR ENERGY BALANCE ON A RESERVOIR TO FIND OUT ITS PERFORMANCE, ARE VERY FAST AND LOW-COST.CAPACITANCE-RESISTANCE MODEL (CRM) SHOWED EFFICIENT AS A FAST RESERVOIR SIMULATION TOOL USING FIELD-AVAILABLE DATA OF PRODUCTION AND INJECTIONS RATES. THIS APPROACH SETS A WEIGHTING FACTOR OR WELL-CONNECTIVITY PARAMETER AND A TIME-CONSTANT BETWEEN EACH PAIR OF INJECTION AND PRODUCTION WELLS ACCORDING TO THEIR HISTORY. IN THIS STUDY, A REAL CASE HAS BEEN MODELED USING CRM AND AN EFFICIENT AND OPTIMUM FIELD TIME-CONSTANT, WHICH COULD BE USED FOR ENTIRE FIELD, HAS BEEN DETERMINED USING CRM SIMULATION RESULTS. ITS ACCURACY IS VERIFIED BY COMPARING THE TOTAL OIL PRODUCTION RATE ERROR AND WELL-PAIR CONNECTIVITIES BETWEEN ORIGINAL AND OPTIMUM CASES.

Multimedia

  • No record.
  • Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    Eshraghi, Seyed Ehsan, RASAEI, MOHAMMAD REZA, Pourafshary, Peyman, Masoumi, AmirSalar, & Kazemzadeh, Yousef. (2015). OPTIMIZING THE TIME-CONSTANT OF CAPACITANCE-RESISTANCE SIMULATION TECHNIQUE. NATIONAL CONFERENCE ON HYDROCARBON RESERVOIR ENGINEERING, SCIENCE AND RELATED INDUSTRIES. SID. https://sid.ir/paper/919737/en

    Vancouver: Copy

    Eshraghi Seyed Ehsan, RASAEI MOHAMMAD REZA, Pourafshary Peyman, Masoumi AmirSalar, Kazemzadeh Yousef. OPTIMIZING THE TIME-CONSTANT OF CAPACITANCE-RESISTANCE SIMULATION TECHNIQUE. 2015. Available from: https://sid.ir/paper/919737/en

    IEEE: Copy

    Seyed Ehsan Eshraghi, MOHAMMAD REZA RASAEI, Peyman Pourafshary, AmirSalar Masoumi, and Yousef Kazemzadeh, “OPTIMIZING THE TIME-CONSTANT OF CAPACITANCE-RESISTANCE SIMULATION TECHNIQUE,” presented at the NATIONAL CONFERENCE ON HYDROCARBON RESERVOIR ENGINEERING, SCIENCE AND RELATED INDUSTRIES. 2015, [Online]. Available: https://sid.ir/paper/919737/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button