مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

108
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

88
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

Learning from Experience of Cost Imposed to Nemat-Abad Dam Project due to Construction Delay

Pages

  65-78

Abstract

 1. Introduction: In construction projects, a huge amount of daily data is created. However, such valuable data are not documented, analyzed and interpreted so that the construction community can learn from the experience of previous projects. Project experiences generally remain in the minds of the personnel, and when they leave the project, such a project experience is lost. This paper examines and analyzes the causes of the Delay and their impact on the cost of the project in the construction of a dam project (Nemat-Abad dam) in Iran. This project with three different contracts and contractors has a great experience and valuable data. The extent and reasons for the Delay are analyzed based on the involvement of project personnel in designed interviews. Lessons learned from failure in project planning and control are provided. The paper is for those who are interested in Dam projects. Delay is known as one of the most important problems of the construction industry in Iran. Although there is advanced literature on Delays in construction projects, little work has been conducted to address the impact of Delays on Dam projects. The term Delay is used in this paper in the sense of Hosseinian (2016) to refer to the difference between the planned completion time and the actual completion time of the project. Identifying the causes of Delay helps the project manager learn from the mistakes of previous projects. . .

Multimedia

  • No record.
  • Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    Hosseinian, Seyed Mahdi, & Estajloo, Samad. (2022). Learning from Experience of Cost Imposed to Nemat-Abad Dam Project due to Construction Delay. JOURNAL OF CIVIL AND ENVIRONMENTAL ENGINEERING (UNIVERSITY OF TABRIZ), 52(2 (107) ), 65-78. SID. https://sid.ir/paper/1051884/en

    Vancouver: Copy

    Hosseinian Seyed Mahdi, Estajloo Samad. Learning from Experience of Cost Imposed to Nemat-Abad Dam Project due to Construction Delay. JOURNAL OF CIVIL AND ENVIRONMENTAL ENGINEERING (UNIVERSITY OF TABRIZ)[Internet]. 2022;52(2 (107) ):65-78. Available from: https://sid.ir/paper/1051884/en

    IEEE: Copy

    Seyed Mahdi Hosseinian, and Samad Estajloo, “Learning from Experience of Cost Imposed to Nemat-Abad Dam Project due to Construction Delay,” JOURNAL OF CIVIL AND ENVIRONMENTAL ENGINEERING (UNIVERSITY OF TABRIZ), vol. 52, no. 2 (107) , pp. 65–78, 2022, [Online]. Available: https://sid.ir/paper/1051884/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button