Journal Paper

Paper Information

video

sound

Persian Version

View:

9,288

Download:

4,761

Cites:

Information Journal Paper

Title

A MULTI-OBJECTIVE MIXED-MODEL ASSEMBLY LINE SEQUENCING PROBLEM WITH STOCHASTIC OPERATION TIME

Pages

 Start Page 157 | End Page 167

Abstract

 In today’s competitive market, those producers who can quickly adapt themselves to diverse demands of customers are successful. Therefore, in order to satisfy these demands of market, Mixed-model assembly line (MMAL) has an increasing growth in industry. A mixed-model assembly line (MMAL) is a type of production line in which varieties of products with common base characteristics are assembled on. This paper focuses on this type of production line in a stochastic environment with three objective functions: 1) total utility work cost, 2) total idle cost, and 3) total production rate variation cost that are simultaneously considered. In real life, especially in manual assembly lines, because of some inevitable human mistakes, breakdown of machines, lack of motivation in workers and the things alike, events are not deterministic, so we consider operation time as a stochastic variable independently distributed with normal distributions; for dealing with it, CHANCE CONSTRAINT optimization is used to model the problem. At first, because of NP-hard nature of the problem, multi-objective harmony search (MOHS) algorithm is proposed to solve it. Then, for evaluating the performance of the proposed algorithm, it is compared with NSGA-II that is a powerful and famous algorithm in this area. At last, numerical examples for comparing these two algorithms with some comparing metrics are presented. The results have shown that MOHS algorithm has a good performance in our proposed model.

Cites

  • No record.
  • References

  • No record.
  • Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops