video

sound

Persian Version

View:

1,812

Download:

0

Cites:

Information Journal Paper

Title

AN OPTIMUM ALGORITHM FOR FLOW SHOP WITH EARLY/TARDY COST

Author(s)

AMIN NAYERI M. | MOSLEHI G.

Pages

  191-209

Keywords

Not Registered.

Abstract

 The problem of determining the sequence of a set of jobs with the objective function (OF) for minimizing the maximum earliness and tardiness, is studied. Since this OF is trying to minimizing and diminish the values of earliness and tardiness, it corresponds to different production systems, such as jIT. This OF is studied in problems associated with m machine and n jobs in Flow Shop case (n/m/P/Etmax).Several methods have developed for solving flow shop problems. Two quick heuristic methods, called HI and H2, with the aim of finding proper solutions in short time, are suggested. The branch and bound (BB) optimal method for solving n/rn/P/ETmax problems is applied. Offering fair upper and lower bounds results in obtaining optimal solutions in many problems. 400 n/rn/P/ETmax problems of small, medium and large sizes are randomly generated.For 83% of problems, optimal solutions are obtained, by BB method. The associated ranges for these problems are 4 to 75 machines and 4 to 50 jobs.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    AMIN NAYERI, M., & MOSLEHI, G.. (2001). AN OPTIMUM ALGORITHM FOR FLOW SHOP WITH EARLY/TARDY COST. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), 12(3), 191-209. SID. https://sid.ir/paper/65852/en

    Vancouver: Copy

    AMIN NAYERI M., MOSLEHI G.. AN OPTIMUM ALGORITHM FOR FLOW SHOP WITH EARLY/TARDY COST. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN)[Internet]. 2001;12(3):191-209. Available from: https://sid.ir/paper/65852/en

    IEEE: Copy

    M. AMIN NAYERI, and G. MOSLEHI, “AN OPTIMUM ALGORITHM FOR FLOW SHOP WITH EARLY/TARDY COST,” INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), vol. 12, no. 3, pp. 191–209, 2001, [Online]. Available: https://sid.ir/paper/65852/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    File Not Exists.