ALL OF THE LARGE INDUSTRIAL FACTORIES PLAN THE TIME DURATION (ABOUT 2 WEEKS) FOR THEIR ANNUAL OVERHAUL, SO IN THIS TIME PERIOD THE POWER DEMAND OF THEM HIGHLY DECREASES DUE TO POWERING OFF OF MANY EQUIPMENTS.
IN THE OTHER SIDE, IRANIAN ELECTRIC NETWORK HAVE AN ANNUAL PEAK DEMAND IN EACH YEAR WHICH USUALLY OCCURS AT THE MIDDLE OF SUMMER (THE HOTTEST DAYS OF YEAR). THIS PEAK LOAD FORCES THE PLANNERS OF NETWORK TO INSTALL A GENERATION CAPACITY THAT IS NOT REQUIRED IN MOST OF TIMES OF YEAR. AT THE SAME TIME OPERATORS OF NETWORK HAVE TO CHALLENGE WITH MANY PROBLEMS DUE TO OPERATION OF SUCH A FULL LOADED NETWORK.
IN RECENT YEARS IRAN POWER GENERATION, TRANSMISSION AND DISTRIBUTION MANAGEMENT CO. (TAVANIR) HAS ESTABLISHED A PLAN FOR SYNCHRONIZING OF IRANIAN INDUSTRIES ANNUAL OVERHAUL WITH THE NETWORK PEAK DAYS IN THE MIDDLE OF SUMMER. TAVANIR USES A MARKING DOWN IN ENERGY PRICES OF COOPERATED INDUSTRIES IN PLAN AS AN ENCOURAGEMENT TOLLS.
IN THIS PAPER THE STAGES OF THIS PLAN IN LEGAL AND EXECUTION HAS DESCRIBED. THEN ALL ITS FEATURE AND ADVANTAGES WAS ANALYZED IN RATIONAL MANNER. THIS RESEARCH SHOWS THAT IRANIAN SUMMER INDUSTRIAL OVERHAUL PLAN HAS THE CONSIDERABLE EFFECTS IN IRANIANS NATIONAL ECONOMY WITHOUT REQUIREMENTS OF ANY OBSERVABLE INVESTMENTS OR FINANCIAL SUPPORTS. FURTHERMORE SOME USEFUL STRATEGIES WERE RECOMMENDED TO MODIFYING THIS PLANS PERFORMANCES.

 
Keyword(s): LOAD MANAGEMENT, DEMAND SIDE MANAGEMENT, ANNUAL OVERHAUL, LOAD CURVE, LOAD PEAK, PEAK SHAVING
 