APA:
CopyPinha, D., & AHLUWALIA, R. (2019). Flexible resource management and its effect on project cost and duration (CASE STUDY). JOURNAL OF INDUSTRIAL ENGINEERING INTERNATIONAL, 15(1), 119-133. https://www.sid.ir/en/journal/ViewPaper.aspx?id=668410
Vancouver:
CopyPinha Denis C., AHLUWALIA RASHPAL S.. Flexible resource management and its effect on project cost and duration (CASE STUDY). JOURNAL OF INDUSTRIAL ENGINEERING INTERNATIONAL. 2019 [cited 2022May21];15(1):119-133. Available from: https://www.sid.ir/en/journal/ViewPaper.aspx?id=668410
IEEE:
CopyPinha, D., AHLUWALIA, R., 2019. Flexible resource management and its effect on project cost and duration (CASE STUDY). JOURNAL OF INDUSTRIAL ENGINEERING INTERNATIONAL, [online] 15(1), pp.119-133. Available: https://www.sid.ir/en/journal/ViewPaper.aspx?id=668410.