Click for new scientific resources and news about Corona[COVID-19]

Paper Information

Journal:   JOURNAL OF INDUSTRIAL ENGINEERING RESEARCH IN PRODUCTION SYSTEMS (IERPS)   2016 , Volume 4 , Number 9 (SPECIAL ISSUE) ; Page(s) 221 To 227.
 
Paper: 

AN AUGMENTED ε-CONSTRAINT METHOD FOR A MULTI-MODEL ASSEMBLY LINE BALANCING PROBLEM WITH PARALLEL WORKSTATIONS AND ZONING CONSTRAINTS

 
 
Author(s):  SANE ZERANG E., HEYDARI J.*
 
* DEPARTMENT OF INDUSTRIAL ENGINEERING, UNIVERSITY OF TEHRAN, TEHRAN, IRAN
 
Abstract: 

This paper develops a 0-1 integer-programming model for multi-model assembly line balancing and equipment selection problem. In the investigated model, parallel stations are allowed under zoning constraints. Under zoning constraints, assignment of different tasks to the same workstation may be forced (positive zoning constraint) or may be forbidden (negative zoning constraint). There are two objectives for the investigated problem: (1) Optimizing the number of workstations over the assembly line and (2) Minimizing the total equipment costs. An augmented ?-constraint method is proposed to solve the investigated problem. To illustrate effectiveness of the proposed model, a numerical example is conducted. Results show the performance of the proposed model.

 
Keyword(s): MULTI-MODEL ASSEMBLY LINE, MULTI-OBJECTIVE OPTIMIZATION, EQUIPMENT SELECTION, PARALLEL WORKSTATIONS, AUGMENTED ε-CONSTRAINT METHOD
 
 
References: 
  • Not Registered.
  •  
  •  
 
Citations: 
  • Not Registered.
 
+ Click to Cite.
APA: Copy

SANE ZERANG, E., & HEYDARI, J. (2016). AN AUGMENTED ε-CONSTRAINT METHOD FOR A MULTI-MODEL ASSEMBLY LINE BALANCING PROBLEM WITH PARALLEL WORKSTATIONS AND ZONING CONSTRAINTS. JOURNAL OF INDUSTRIAL ENGINEERING RESEARCH IN PRODUCTION SYSTEMS (IERPS), 4(9 (SPECIAL ISSUE) ), 221-227. https://www.sid.ir/en/journal/ViewPaper.aspx?id=572662



Vancouver: Copy

SANE ZERANG E., HEYDARI J.. AN AUGMENTED ε-CONSTRAINT METHOD FOR A MULTI-MODEL ASSEMBLY LINE BALANCING PROBLEM WITH PARALLEL WORKSTATIONS AND ZONING CONSTRAINTS. JOURNAL OF INDUSTRIAL ENGINEERING RESEARCH IN PRODUCTION SYSTEMS (IERPS). 2016 [cited 2021October23];4(9 (SPECIAL ISSUE) ):221-227. Available from: https://www.sid.ir/en/journal/ViewPaper.aspx?id=572662



IEEE: Copy

SANE ZERANG, E., HEYDARI, J., 2016. AN AUGMENTED ε-CONSTRAINT METHOD FOR A MULTI-MODEL ASSEMBLY LINE BALANCING PROBLEM WITH PARALLEL WORKSTATIONS AND ZONING CONSTRAINTS. JOURNAL OF INDUSTRIAL ENGINEERING RESEARCH IN PRODUCTION SYSTEMS (IERPS), [online] 4(9 (SPECIAL ISSUE) ), pp.221-227. Available: https://www.sid.ir/en/journal/ViewPaper.aspx?id=572662.



 
 
Persian Abstract Yearly Visit 59
 
 
Latest on Blog
Enter SID Blog