Click for new scientific resources and news about Corona[COVID-19]

Paper Information

Journal:   IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY TRANSACTION B- ENGINEERING   MAY 2015 , Volume 39 , Number M1+ (MECHANICAL ENGINEERING); Page(s) 253 To 260.
 
Paper: 

ASSEMBLY PERFORMANCE OF A GASKETED BOLTED FLANGED PIPE JOINT USING DIFFERENT BOLT TIGHTENING STRATEGIES

 
 
Author(s):  ABIDI M.*, ABDUL WAJID H., ABBAS A., MEHMOOD Y.
 
* INTERDISCIPLINARY RESEARCH CENTER, COMSATS INSTITUTE OF INFORMATION TECHNOLOGY, WAH CANTT, PAKISTAN
 
Abstract: 

This paper presents the results of the assembly process of a gasketed bolted flanged pipe joint for two different bolt tightening strategies, i.e. ASME and Industrial using torque control of preload method. The final clamping force is achieved in four and five passes in ASME and Industrial strategy respectively. Axial bolt stress variation, at the end of each pass, individual bolt bending behavior, gasket stress and flange stress variations for both strategies are discussed.

 
Keyword(s): PIPE FLANGE JOINT, ASSEMBLY PROCESS, TORQUE CONTROL, CLAMPING FORCE, FINITE ELEMENT ANALYSIS
 
 
References: 
  • Not Registered.
  •  
  •  
 
Citations: 
  • Not Registered.
 
+ Click to Cite.
APA: Copy

ABIDI, M., & ABDUL WAJID, H., & ABBAS, A., & MEHMOOD, Y. (2015). ASSEMBLY PERFORMANCE OF A GASKETED BOLTED FLANGED PIPE JOINT USING DIFFERENT BOLT TIGHTENING STRATEGIES. IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY TRANSACTION B- ENGINEERING, 39(M1+ (MECHANICAL ENGINEERING)), 253-260. https://www.sid.ir/en/journal/ViewPaper.aspx?id=509190



Vancouver: Copy

ABIDI M., ABDUL WAJID H., ABBAS A., MEHMOOD Y.. ASSEMBLY PERFORMANCE OF A GASKETED BOLTED FLANGED PIPE JOINT USING DIFFERENT BOLT TIGHTENING STRATEGIES. IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY TRANSACTION B- ENGINEERING. 2015 [cited 2021July27];39(M1+ (MECHANICAL ENGINEERING)):253-260. Available from: https://www.sid.ir/en/journal/ViewPaper.aspx?id=509190



IEEE: Copy

ABIDI, M., ABDUL WAJID, H., ABBAS, A., MEHMOOD, Y., 2015. ASSEMBLY PERFORMANCE OF A GASKETED BOLTED FLANGED PIPE JOINT USING DIFFERENT BOLT TIGHTENING STRATEGIES. IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY TRANSACTION B- ENGINEERING, [online] 39(M1+ (MECHANICAL ENGINEERING)), pp.253-260. Available: https://www.sid.ir/en/journal/ViewPaper.aspx?id=509190.



 
  pdf-File
Yearly Visit 50
 
 
Latest on Blog
Enter SID Blog