Click for new scientific resources and news about Corona[COVID-19]

Paper Information

Journal:   OCCUPATIONAL MEDICINE   FALL 2014 , Volume 6 , Number 3; Page(s) 20 To 31.
 
Paper: 

CHANGE ANALYZE BEFORE AND AFTER THE IMPLEMENTATION OF INTEGRATED MANAGEMENT SYSTEMS (IMS) USING SAFETY PERFORMANCE MONITORING INDICATORS

 
 
Author(s):  HALVANI GH., BARKHORDARI A., LAAL F.*, KHOSHAKHLAGH A., MIHANPOOR H.
 
* 
 
Abstract: 

Background: By considering the development of power plants in the country and identifying potential hazards in the mentioned work process, this study intends to change analyzes before and after the implementation of integrated management systems to control the consequences of hazards by this systematic methods.
Materials and Methods: This study is a descriptive - analytical in type of before and after that during the years 1383 to 1390 in Yazd combined cycle power plant is accomplished. Variables are hour of work, days of lost work, the coefficient of accident frequency rate (AFR), coefficient of accident severity rate (ASR), the coefficient of accident frequency severity rate (FSI), the coefficient of T Safe (safe t score) and the coefficient of incident rate (IR) and frequency rate (FR).
Results: Among different jobs, the highest number of accidents was related to workers and the lowest number of incidents was related to engineers and experts. The highest rate indicators of the frequency, intensity, intensity - frequency and frequency rate and incident rate coefficients related to the year 1383 (the year before the implementation of integrated management systems) and the highest accident severity index was related to year 1387. Meanwhile the lowest Value of all indicators belongs to year 1390. According to the safe T coefficient, until 1388, changes have been Significant and the situation has improved and significant in the years 1390-1389 (safe t score<-3).
Conclusions: Results have showed that the implementation of safety programs has a positive impact on reduction of accident indicators and on various situation is used by coefficients that change trend will show better than control chart.

 
Keyword(s): ACCIDENT FREQUENCY RATE, ACCIDENT SEVERITY RATE, FREQUENCY SEVERITY INDEX, SAFE T SCORE, INCIDENT RATE, FREQUENCY RATE
 
 
References: 
  • ندارد
  •  
 
Click to Cite.
APA: Copy

HALVANI, G., & BARKHORDARI, A., & LAAL, F., & KHOSHAKHLAGH, A., & MIHANPOOR, H. (2014). CHANGE ANALYZE BEFORE AND AFTER THE IMPLEMENTATION OF INTEGRATED MANAGEMENT SYSTEMS (IMS) USING SAFETY PERFORMANCE MONITORING INDICATORS. OCCUPATIONAL MEDICINE, 6(3), 20-31. https://www.sid.ir/en/journal/ViewPaper.aspx?id=506930



Vancouver: Copy

HALVANI GH., BARKHORDARI A., LAAL F., KHOSHAKHLAGH A., MIHANPOOR H.. CHANGE ANALYZE BEFORE AND AFTER THE IMPLEMENTATION OF INTEGRATED MANAGEMENT SYSTEMS (IMS) USING SAFETY PERFORMANCE MONITORING INDICATORS. OCCUPATIONAL MEDICINE. 2014 [cited 2021May11];6(3):20-31. Available from: https://www.sid.ir/en/journal/ViewPaper.aspx?id=506930



IEEE: Copy

HALVANI, G., BARKHORDARI, A., LAAL, F., KHOSHAKHLAGH, A., MIHANPOOR, H., 2014. CHANGE ANALYZE BEFORE AND AFTER THE IMPLEMENTATION OF INTEGRATED MANAGEMENT SYSTEMS (IMS) USING SAFETY PERFORMANCE MONITORING INDICATORS. OCCUPATIONAL MEDICINE, [online] 6(3), pp.20-31. Available: https://www.sid.ir/en/journal/ViewPaper.aspx?id=506930.



 
 
Yearly Visit 39 Persian Abstract
 
Latest on Blog
Enter SID Blog