Click for new scientific resources and news about Corona[COVID-19]

Paper Information

Journal:   JOURNAL OF OPTIMIZATION IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING)   FALL 2014 , Volume 8 , Number 3 (16); Page(s) 21 To 29.
 
Paper: 

META HEURISTIC FOR MINIMIZING MAKESPAN IN A FLOW-LINE MANUFACTURING CELL WITH SEQUENCE DEPENDENT FAMILY SETUP TIMES

 
 
Author(s):  NIKJO BEHZAD, REZAEIAN JAVAD*
 
* DEPARTMENT OF INDUSTRIAL ENGINEERING, MAZANDARAN UNIVERSITY OF SCIENCE AND TECHNOLOGY, BABOL, IRAN
 
Abstract: 

This paper presents a new mathematical model for the problem of scheduling part families and jobs within each part family in a flow line manufacturing cell where the setup times for each family are sequence dependent and it is desired to minimize the maximum completion time of the last job on the last machine (makespan) while processing parts (jobs) in each family together. Gaining an optimal solution for this type of complex problem in large sizes in reasonable computational time using traditional approaches or optimization tools is extremely difficult. A meta-heuristic method based on Simulated Annealing (SA) is proposed to solve the presented model. Based on the computational analyses, the proposed algorithm was found efficient and effective at finding good quality solutions.

 
Keyword(s): SCHEDULING, SIMULATE ANNEALING, FLOW LINE MANUFACTURING, SETUP TIMES, MAKESPAN
 
References: 
 
  pdf-File tarjomyar Yearly Visit 79
 
Latest on Blog
Enter SID Blog