Click for new scientific resources and news about Corona[COVID-19]

Paper Information

Journal:   SCIENTIA IRANICA   2014 , Volume 21 , Number 3 (TRANSACTIONS E: INDUSTRIAL ENGINEERING); Page(s) 1083 To 1095.
 
Paper: 

A TWO-PHASE METHOD FOR A MULTI-SKILLED PROJECT SCHEDULING PROBLEM WITH DISCOUNTED CASH OWS

 
 
Author(s):  TABRIZI B.H., TAVAKKOLI MOGHADDAM R.*, GHADERI S.F.
 
* SCHOOL OF INDUSTRIAL ENGINEERING, COLLEGE OF ENGINEERING, UNIVERSITY OF TEHRAN, TEHRAN, IRAN
 
Abstract: 

This paper considers a multi-skilled project scheduling problem that is a newly developed extension of the Resource-Constrained Project Scheduling Problem (RCPSP). The main dierence in such problems, compared with classic scheduling problems, is associated with the given resources, which are only dependent on human type. Additionally, the net present value of a given project is considered by its cash in and out ow to guarantee project success. To solve the given problem, an enhanced two-phase method is proposed using genetic and path relinking algorithms, whose parameters are tuned by the Taguchi method to provide robust comparisons. Furthermore, the potential changes in the project execution method are considered for some of the mostly used payment methods. Finally, some dierent-sized instances are tested to check the performance and eciency of the proposed method.

 
Keyword(s): MULTI-SKILLED PROJECT SCHEDULING PROBLEM, CASH OWS, GENETIC ALGORITHM, PATH RELINKING ALGORITHM
 
 
References: 
  • ندارد
  •  
 
Click to Cite.
APA: Copy

TABRIZI, B., & TAVAKKOLI MOGHADDAM, R., & GHADERI, S. (2014). A TWO-PHASE METHOD FOR A MULTI-SKILLED PROJECT SCHEDULING PROBLEM WITH DISCOUNTED CASH OWS. SCIENTIA IRANICA, 21(3 (TRANSACTIONS E: INDUSTRIAL ENGINEERING)), 1083-1095. https://www.sid.ir/en/journal/ViewPaper.aspx?id=406433



Vancouver: Copy

TABRIZI B.H., TAVAKKOLI MOGHADDAM R., GHADERI S.F.. A TWO-PHASE METHOD FOR A MULTI-SKILLED PROJECT SCHEDULING PROBLEM WITH DISCOUNTED CASH OWS. SCIENTIA IRANICA. 2014 [cited 2021May09];21(3 (TRANSACTIONS E: INDUSTRIAL ENGINEERING)):1083-1095. Available from: https://www.sid.ir/en/journal/ViewPaper.aspx?id=406433



IEEE: Copy

TABRIZI, B., TAVAKKOLI MOGHADDAM, R., GHADERI, S., 2014. A TWO-PHASE METHOD FOR A MULTI-SKILLED PROJECT SCHEDULING PROBLEM WITH DISCOUNTED CASH OWS. SCIENTIA IRANICA, [online] 21(3 (TRANSACTIONS E: INDUSTRIAL ENGINEERING)), pp.1083-1095. Available: https://www.sid.ir/en/journal/ViewPaper.aspx?id=406433.



 
  pdf-File
Yearly Visit 59
 
Latest on Blog
Enter SID Blog