Click for new scientific resources and news about Corona[COVID-19]

Paper Information

Journal:   INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN)   FALL 2006 , Volume 17 , Number 4; Page(s) 97 To 104.
 
Paper: 

ORE ESTIMATION IN ANGOURAN MINE USING 3D MODELLIG

 
 
Author(s):  JAFARI A.A.F., KESHMIRI B., KHOUDAYARI A.A.
 
* 
 
Abstract: 

Estimation of deposit, specially in the mines under operation, is an important factor influencing design and production plan. Along with new exploration, ore estimation requires to be updated. Due to importance of this part of the exploration (ore estimation), many methods have been so far developed to increase reliability and speed. DATAMINE is software developed for this purpose and is one of the most popular. In this research ore estimation in Angouran mine was performed, using latest version of DATAMINE. Data from recent exploration is incorporated, necessary sections are produced and final model of ore deposit is constructed. Three different block size was chosen to study size effect and final selection was made based on the results. Ore deposit in Angouran Mine. Is estimated to be 16.9 million tones of ore with 25.92% zinc and 4.76% lead.

 
Keyword(s): 
 
References: 
  • ندارد
 
  Persian Abstract Yearly Visit 79
 
Latest on Blog
Enter SID Blog