APA:
CopyGANJI, M., & ALINAGHIAN, M., & SAJADI, S. (2016). A NEW MODEL FOR OPTIMIZING SIMULTANEOUSLY PROJECTS SELECTION AND RESOURCE- CONSTRAINED PROJECT SCHEDULING PROBLEM WITH PARTICLE SWARM OPTIMIZATION. PRODUCTION AND OPERATIONS MANAGEMENT, 7(1 (12) ), 235-246. https://www.sid.ir/en/journal/ViewPaper.aspx?id=570810
Vancouver:
CopyGANJI MALIHEH, ALINAGHIAN MAHDI, SAJADI S.MOJTABA. A NEW MODEL FOR OPTIMIZING SIMULTANEOUSLY PROJECTS SELECTION AND RESOURCE- CONSTRAINED PROJECT SCHEDULING PROBLEM WITH PARTICLE SWARM OPTIMIZATION. PRODUCTION AND OPERATIONS MANAGEMENT. 2016 [cited 2022August13];7(1 (12) ):235-246. Available from: https://www.sid.ir/en/journal/ViewPaper.aspx?id=570810
IEEE:
CopyGANJI, M., ALINAGHIAN, M., SAJADI, S., 2016. A NEW MODEL FOR OPTIMIZING SIMULTANEOUSLY PROJECTS SELECTION AND RESOURCE- CONSTRAINED PROJECT SCHEDULING PROBLEM WITH PARTICLE SWARM OPTIMIZATION. PRODUCTION AND OPERATIONS MANAGEMENT, [online] 7(1 (12) ), pp.235-246. Available: https://www.sid.ir/en/journal/ViewPaper.aspx?id=570810.