Click for new scientific resources and news about Corona[COVID-19]

Paper Information

Journal:   JOURNAL OF INDUSTRIAL STRATEGIC MANAGEMENT (PAJOUHESHGAR)   WINTER 2015 , Volume 11 , Number 36; Page(s) 73 To 85.
 
Paper: 

Identifying And Explaining The Barriers Of On-Time Delivery In Water Projects: Case Study Of Regional Water Co. In Mazandaran

 
 
Author(s):  Mokhktari M., Azadi H.R.
 
* 
 
Abstract: 
Construction plans are regarded as the basis of the economy in the society. Any delays in the utilization of projects can cause to waste the investments and the loss of technical and economic justifications. In this paper, the barriers of on-time delivery in water projects will be scrutinized in Mazandaran Regional Water Company. So, the independent variables such as management obstacles, cultural, social, economic, financial, juridical, legal, technical, infrastructural factors, and dependable variable or human factors would be influential in the delays in construction projects. The research methodology is to provide a descriptive-survey study and the population includes 169 managers, experts, employers, and contractors working in various parts of water construction projects in Mazandaran Water Joint Stock Company selected by simple random sampling. The data is collected through a questionnaire in which the reliability coefficient calculated based on Cronbach's Alpha (?=87%). By using SPSS, descriptive and inferential statistics and Friedman's correlation coefficient, an intelligent analysis will be performed. The research findings represent that there are positive and meaningful relations between the average rates in the obstacles to management, total eight questions of economic and financial barriers, the lack of technical and infrastructural factors, environmental obstacles, juridical and legal problems and finally the barriers in human factors.
 
Keyword(s): MANAGERIAL BARRIERS, ECONOMIC/FINANCIAL BARRIERS, TECHNICAL/INFRASTRUCTURAL BARRIERS, HUMAN BARRIERS, ENVIRONMENTAL BARRIERS, JURIDICAL/LEGAL BARRIERS, POLITICAL BARRIERS
 
 
International related papers: 
 
Most related Highly related Moderately related Least related
 
References: 
  • Not Registered.
  •  
  •  
 
Citations: 
  • Not Registered.
 
+ Click to Cite.
APA: Copy

MOKHKTARI, M., & AZADI, H. (2015). IDENTIFYING AND EXPLAINING THE BARRIERS OF ON-TIME DELIVERY IN WATER PROJECTS: CASE STUDY OF REGIONAL WATER CO. IN MAZANDARAN. JOURNAL OF INDUSTRIAL STRATEGIC MANAGEMENT (PAJOUHESHGAR), 11(36), 73-85. https://www.sid.ir/en/journal/ViewPaper.aspx?id=475374



Vancouver: Copy

MOKHKTARI M., AZADI H.R.. IDENTIFYING AND EXPLAINING THE BARRIERS OF ON-TIME DELIVERY IN WATER PROJECTS: CASE STUDY OF REGIONAL WATER CO. IN MAZANDARAN. JOURNAL OF INDUSTRIAL STRATEGIC MANAGEMENT (PAJOUHESHGAR). 2015 [cited 2022January28];11(36):73-85. Available from: https://www.sid.ir/en/journal/ViewPaper.aspx?id=475374



IEEE: Copy

MOKHKTARI, M., AZADI, H., 2015. IDENTIFYING AND EXPLAINING THE BARRIERS OF ON-TIME DELIVERY IN WATER PROJECTS: CASE STUDY OF REGIONAL WATER CO. IN MAZANDARAN. JOURNAL OF INDUSTRIAL STRATEGIC MANAGEMENT (PAJOUHESHGAR), [online] 11(36), pp.73-85. Available: https://www.sid.ir/en/journal/ViewPaper.aspx?id=475374.



 
 
Persian Abstract Yearly Visit 49
 
 
Latest on Blog
Enter SID Blog