Click for new scientific resources and news about Corona[COVID-19]

Paper Information

Journal:   INTERNATIONAL JOURNAL OF INDUSTRIAL MATHEMATICS   WINTER 2015 , Volume 7 , Number 1; Page(s) 13 To 24.
 
Paper: 

Electromagnetism-Like Algorithm For Fuzzy Flow Shop Batch Processing Machines Scheduling To Minimize Total Weighted Earliness And Tardiness

 
 
Author(s):  Molla Alizadeh Zavardehi S.*, Tavakkoli Moghaddam R., Hosseinzadeh Lotfi F.
 
* DEPARTMENT OF INDUSTRIAL ENGINEERING, SCIENCE AND RESEARCH BRANCH, ISLAMIC AZAD UNIVERSITY, TEHRAN, IRAN
 
Abstract: 
In this paper, we study a flow shop batch processing machines scheduling problem. The fuzzy due dates are considered to make the problem more close to the reality. The objective function is taken as the weighted sum of fuzzy earliness and fuzzy tardiness. In order to tackle the given problem, we propose a hybrid electromagnetism-like (EM) algorithm, in which the EM is hybridized with a diversification mechanism and effective local search to enhance the efficiency of the algorithm.The proposed algorithms are evaluated by comparison against two existing well-known EMs in the literature. Additionally, we propose some heuristics based on the earliest due date (EDD) to solve the given problem. The proposed hybrid EM algorithm is tested on sets of various randomly generated instances. For this purpose, we investigate the impacts of the rise in problem sizes on the performance of the developed algorithm. Through the analysis of the experimental results, the highly effective performance of the proposed algorithm is shown against the two existing well-known EMs from the literature and proposed EDDs.
 
Keyword(s): FLOW SHOP BATCH PROCESSING MACHINES, FUZZY DUE DATE, HYBRID ELECTROMAGNETISM-LIKE ALGORITHM, FUZZY EARLINESS/TARDINESS
 
 
International related papers: 
 
Most related Highly related Moderately related Least related
 
References: 
 
Citations: 
  • Not Registered.
 
+ Click to Cite.
APA: Copy

MOLLA ALIZADEH ZAVARDEHI, S., & TAVAKKOLI MOGHADDAM, R., & HOSSEINZADEH LOTFI, F. (2015). ELECTROMAGNETISM-LIKE ALGORITHM FOR FUZZY FLOW SHOP BATCH PROCESSING MACHINES SCHEDULING TO MINIMIZE TOTAL WEIGHTED EARLINESS AND TARDINESS. INTERNATIONAL JOURNAL OF INDUSTRIAL MATHEMATICS, 7(1), 13-24. https://www.sid.ir/en/journal/ViewPaper.aspx?id=427742



Vancouver: Copy

MOLLA ALIZADEH ZAVARDEHI S., TAVAKKOLI MOGHADDAM R., HOSSEINZADEH LOTFI F.. ELECTROMAGNETISM-LIKE ALGORITHM FOR FUZZY FLOW SHOP BATCH PROCESSING MACHINES SCHEDULING TO MINIMIZE TOTAL WEIGHTED EARLINESS AND TARDINESS. INTERNATIONAL JOURNAL OF INDUSTRIAL MATHEMATICS. 2015 [cited 2022January23];7(1):13-24. Available from: https://www.sid.ir/en/journal/ViewPaper.aspx?id=427742



IEEE: Copy

MOLLA ALIZADEH ZAVARDEHI, S., TAVAKKOLI MOGHADDAM, R., HOSSEINZADEH LOTFI, F., 2015. ELECTROMAGNETISM-LIKE ALGORITHM FOR FUZZY FLOW SHOP BATCH PROCESSING MACHINES SCHEDULING TO MINIMIZE TOTAL WEIGHTED EARLINESS AND TARDINESS. INTERNATIONAL JOURNAL OF INDUSTRIAL MATHEMATICS, [online] 7(1), pp.13-24. Available: https://www.sid.ir/en/journal/ViewPaper.aspx?id=427742.



 
  pdf-File
Persian Abstract Yearly Visit 104
 
 
Latest on Blog
Enter SID Blog