Click for new scientific resources and news about Corona[COVID-19]

Paper Information

Journal:   JOURNAL OF OPTIMIZATION IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING)   SUMMER 2012 , Volume 6 , Number 2 (11); Page(s) 33 To 41.
 
Paper: 

A Multi-Objective Simulated Annealing Algorithm For Solving The Flexible No-Wait Flowshop Scheduling Problem With Transportation Times

 
 
Author(s):  Naderi Bahman*, Sadeghi Hassan
 
* YOUNG RESEARCHERS CLUB, QAZVIN BRANCH, ISLAMIC AZAD UNIVERSITY, QAZVIN, IRAN
 
Abstract: 
This paper deals with a bi-objective hybrid no-wait flowshop scheduling problem minimizing the make span and total weighted tardiness, in which we consider transportation times between stages. Obtaining an optimal solution for this type of complex, large-sized problem in a reasonable computational time by using traditional approaches and optimization tools is extremely difficult. This paper, therefore, presents a new multi-objective simulated annealing algorithm (MOSA). A set of experimental instances are carried out to evaluate the algorithm by advanced multi-objective performance measures. In fact, the performance of the algorithm is carefully evaluated in terms of the available algorithms by means of multi-objective performance measures and statistical tools. The results show that compared with other algorithms, a variant of our proposed MOSA produces a good performance.
 
Keyword(s): NO-WAIT HYBRID FLOWSHOP SCHEDULING, MULTI-OBJECTIVE SIMULATED ANNEALING ALGORITHM, MAKESPAN, TOTAL WEIGHTED TARDINESS
 
 
International related papers: 
 
Most related Highly related Moderately related Least related
 
References: 
 
Citations: 
 
+ Click to Cite.
APA: Copy

NADERI, B., & SADEGHI, H. (2012). A MULTI-OBJECTIVE SIMULATED ANNEALING ALGORITHM FOR SOLVING THE FLEXIBLE NO-WAIT FLOWSHOP SCHEDULING PROBLEM WITH TRANSPORTATION TIMES. JOURNAL OF OPTIMIZATION IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING), 6(2 (11)), 33-41. https://www.sid.ir/en/journal/ViewPaper.aspx?id=377413



Vancouver: Copy

NADERI BAHMAN, SADEGHI HASSAN. A MULTI-OBJECTIVE SIMULATED ANNEALING ALGORITHM FOR SOLVING THE FLEXIBLE NO-WAIT FLOWSHOP SCHEDULING PROBLEM WITH TRANSPORTATION TIMES. JOURNAL OF OPTIMIZATION IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING). 2012 [cited 2022January25];6(2 (11)):33-41. Available from: https://www.sid.ir/en/journal/ViewPaper.aspx?id=377413



IEEE: Copy

NADERI, B., SADEGHI, H., 2012. A MULTI-OBJECTIVE SIMULATED ANNEALING ALGORITHM FOR SOLVING THE FLEXIBLE NO-WAIT FLOWSHOP SCHEDULING PROBLEM WITH TRANSPORTATION TIMES. JOURNAL OF OPTIMIZATION IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING), [online] 6(2 (11)), pp.33-41. Available: https://www.sid.ir/en/journal/ViewPaper.aspx?id=377413.



 
  pdf-File
Yearly Visit 58
 
 
Latest on Blog
Enter SID Blog