List Of Volumes: 7 Volume(s) Year 2019 Year 2016 Year 2012 Year 2010 Year 2009 Year 2008 Volume 1, Number 4 Volume 2, Number 3 Volume 2, Number 2 Volume 2, Number 1 Year 2007
List Of Journal Paper(s): QUARTERLY JOURNAL OF INDUSTRIAL AND SYSTEMS ENGINEERING (JISE):WINTER 2008, Volume 1, Number 4 6 Paper(s) 1 : IDENTIFYING USEFUL VARIABLES FOR VEHICLE BRAKING USING THE ADJOINT MATRIX APPROACH TO THE MAHALANOBIS-TAGUCHI SYSTEM Author(s): CUDNEY E.A.,PARYANI K.,RAGSDELL K.M. Page(s): From 281 To 292 Keyword(s): MAHALANOBIS-TAGUCHI SYSTEM (MTS), MAHALANOBIS DISTANCE (MD), ADJOINT MATRIX, PATTERN RECOGNITION, ORTHOGONAL ARRAY (OA), SIGNAL-TO-NOISE RATIO (SN), MAHALANOBIS SPACE (REFERENCE GROUP) Reference(s): (0) Citation(s): (0) FullText: 2 : A GOAL PROGRAMMING METHOD FOR FINDING COMMON WEIGHTS IN DEA WITH AN IMPROVED DISCRIMINATING POWER FOR EFFICIENCY Author(s): MAKUEI A.*,ALINEZHAD A.,KIANI MAVI R.,ZOHREHBANDIAN M. Page(s): From 293 To 303 Keyword(s): MOLP, GOAL PROGRAMMING, DEA, EFFICIENCY, RANKING, WEIGHT RESTRICTIONS Reference(s): (0) Citation(s): (0) FullText: 3 : A NEW SOLUTION FOR THE CYCLIC MULTIPLE-PART TYPE THREE-MACHINE ROBOTIC CELL PROBLEM BASED ON THE PARTICLE SWARM META-HEURISTIC Author(s): KAMAL ABADI N.*,GHOLAMI S.,MIRZAEI A.H. Page(s): From 304 To 317 Keyword(s): CYCLIC BLOCKING FLOW-SHOP, PARTICLE SWARM OPTIMISATION, ROBOTIC CELL, SCHEDULING Reference(s): (0) Citation(s): (0) FullText: 4 : MACHINE CELL FORMATION BASED ON A NEW SIMILARITY COEFFICIENT Author(s): GARBIE I.H.*,PARSAEI H.R.,LEEP H.R. Page(s): From 318 To 344 Keyword(s): CELLULAR MANUFACTURING, SIMILARITY COEFFICIENTS, MACHINE CELLS Reference(s): (0) Citation(s): (1) FullText: 5 : GENERALIZED CYCLIC OPEN SHOP SCHEDULING AND A HYBRID ALGORITHM Author(s): GHANDEHARI MAHSA Page(s): From 345 To 359 Keyword(s): OPEN SHOP SCHEDULING, CYCLIC OPEN SHOP SCHEDULING, META HEURISTIC, ACO; BEAM SEARCH Reference(s): (0) Citation(s): (0) FullText: 6 : STUDY OF SCHEDULING PROBLEMS WITH MACHINE AVAILABILITY CONSTRAINT Author(s): DEHNAR SAEIDI H.R.*,TAGHAVIFARD MOHAMMAD TAGHI Page(s): From 360 To 383 Keyword(s): SEQUENCING, SCHEDULING, UNAVAILABILITY PERIOD, RESUMABLE, BREAKDOWN, NP-HARD Reference(s): (0) Citation(s): (0) FullText: