List Of Volumes: 12 Volume(s) Year 2019 Year 2018 Year 2017 Year 2016 Year 2015 Year 2014 Volume 8, Number 3 (16) Volume 8, Number 2 (15) Volume 8, Number 1 (14) Year 2013 Year 2012 Year 2011 Year 2010 Year 2009 Year 2008
List Of Journal Paper(s): QUARTERLY JOURNAL OF OPTIMIZATION IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING):WINTER 2014, Volume 8, Number 1 (14) 8 Paper(s) 1 : COMPLETE / INCOMPLETE HIERARCHICAL HUB CENTER SINGLE ASSIGNMENT NETWORK PROBLEM Author(s): ARSHADI KHAMSEH ALIREZA*,DOOST MOHAMADI MOHAMMAD Page(s): From 1 To 12 Keyword(s): HUB LOCATION, HUB CENTER, HIERARCHICAL, COMPLETE AND INCOMPLETE NETWORK Reference(s): (1) Citation(s): (0) FullText: 2 : COMPARING PARALLEL SIMULATED ANNEALING, PARALLEL VIBRATING DAMP OPTIMIZATION AND GENETIC ALGORITHM FOR JOINT REDUNDANCY- AVAILABILITY PROBLEMS IN A SERIES-PARALLEL SYSTEM WITH MULTI-STATE COMPONENTS Author(s): SHARIFI MANI*,MOUSAKHANI MORTEZA,ZARETALAB ARASH Page(s): From 13 To 26 Keyword(s): SA, VDO, PARALLEL, AVAILABILITY, MULTI-STATE, REDUNDANCY Reference(s): (2) Citation(s): (0) FullText: 3 : MULTI-OBJECTIVE AND SCALABLE HEURISTIC ALGORITHM FOR WORKFLOW TASK SCHEDULING IN UTILITY GRIDS Author(s): KHAJEHVAND VAHID*,PEDRAM HOSSEIN,ZANDIEH MOSTAFA Page(s): From 27 To 36 Keyword(s): UTILITY GRIDS, RESOURCE PROVISIONING, WORKFLOW SCHEDULING, MULTI-OBJECTIVE OPTIMIZATION, SCALABILITY Reference(s): (8) Citation(s): (0) FullText: 4 : A SIMULATED ANNEALING ALGORITHM TO DETERMINE A GROUP LAYOUT AND PRODUCTION PLAN IN A DYNAMIC CELLULAR MANUFACTURING SYSTEM Author(s): KIA REZA*,JAVADIAN NIKBAKHSH,TAVAKKOLI MOGHADDAM REZA Page(s): From 37 To 52 Keyword(s): DYNAMIC CELLULAR MANUFACTURING SYSTEMS, GGROUP LAYOUT, PRODUCTION PLANNING, SIMULATED ANNEALING Reference(s): (4) Citation(s): (0) FullText: 5 : PHASE-II MONITORING OF AR (1) AUTO CORRELATED POLYNOMIAL PROFILES Author(s): KERAMATPOUR MEHDI,AKHAVAN NIAKI SEYED TAGHI*,AMIRI AMIRHOSSEIN Page(s): From 53 To 59 Keyword(s): STATISTICAL PROCESS CONTROL, POLYNOMIAL PROFILES, PHASE-?? MONITORING, AUTOCORRELATION, AVERAGE RUN LENGTH Reference(s): (11) Citation(s): (1) FullText: 6 : FUZZY PROGRAMMING FOR PARALLEL MACHINES SCHEDULING: MINIMIZING WEIGHTED TARDINESS/EARLINESS AND FLOW TIME THROUGH GENETIC ALGORITHM Author(s): ASGHARI MOHAMMAD*,NEZHADALI SAMANEH Page(s): From 61 To 73 Keyword(s): MATHEMATICAL OPTIMIZATION, FUZZY MULTI-OBJECTIVE MODEL, PARALLEL MACHINES SCHEDULING, WEIGHTED TARDINESS/EARLINESS, GENETIC ALGORITHM Reference(s): (3) Citation(s): (0) FullText: 7 : VMI-TYPE SUPPLY CHAINS: A BRIEF REVIEW Author(s): AKHBARI MOHSEN*,ZARE MEHRJERDI YAHIA,KHADEMI ZARE HASAN,MAKUI AHMAD Page(s): From 75 To 87 Keyword(s): VENDOR-MANAGED INVENTORY, CONTRACT, SUPPLY CHAIN, INVENTORY Reference(s): (13) Citation(s): (0) FullText: 8 : A MULTI-OBJECTIVE EVOLUTIONARY APPROACH FOR INTEGRATED PRODUCTION- DISTRIBUTION PLANNING PROBLEM IN A SUPPLY CHAIN NETWORK Author(s): SARRAFHA KEYVAN*,KAZEMI ABOLFAZL,ALINEZHAD ALIREZA Page(s): From 89 To 102 Keyword(s): SUPPLY CHAIN NETWORK (SCN), INTEGRATED PRODUCTION-DISTRIBUTION PLANNING (PDP), MULTI-OBJECTIVE SIMULATED ANNEALING (MOSA), NON-DOMINATED SORTING GENETIC ALGORITHM (NSGA-II), TAGUCHI METHOD Reference(s): (4) Citation(s): (0) FullText: